Projects

Projects

With our highly efficient and unmatched quality products, we have achieved an enviable position in domestic as well as international market. We use finest quality raw material, procured from reliable sources to produce best quality range. Additionally, we have a team of well qualified professionals, who work closely with the clients to understand their requirements and offer best options for their specific needs. Some of the products offered by us are:

Projects Completed /In progress:-

 

S.NO

 

CLIENT

 

PROJECT DETAILS

 

Amountof Workin lacs

 

Type of Work

 

Status of Work

 

 

 

1 MPPWD,MORENA WORK FROM OF MPPWD CONSTRUCTIONOF    NOORABADH    TEKRI   TO     BOCHOLARITORA ROAD     LENGTH 27.00 KM. TEKRI-SUMWALI TO IMILIYA ROAD LENGTH 22.80KM DISTT MORENA 6170.14 ROAD
In Progress
MPPWDGWALIOR WORK FROM OF MPPWD CONSTRUCTIONFROM GOL PAHARIYA TO GUPTESHWARMANSIR    LENGTH 09.20 KM ROAD DISTTGWALIORROAD CONSTRUCTION   OF   SHANICHARA
2 2342.87 ROAD In Progress
3 MPPWDGWALIOR MANDIR      TO      BATESHWAR                       PADAVALIRITHORA ROAD. LENGTH – 9.8 KM. KHEDAAJNODA KUTWAR TO BICHOLA RITHORAROAD. LENGTH – 13.76 KM/ BANMOR TOSANICHARA MANDIR   ROAD.   LENGTH   -12.66 KM. TOTAL LENGTH 36.22 KM. INTHE STATE OF MADHYA PRADESH ON EPCMODE” 4865.00 ROAD In Progress
TATA PROJECTSLTD. HYDERABAD SUPPLY     AND     INSTALLATION     OF     5.7MLD     WATER     TREATMENT               PLANT,FORSAGARWATER                                                   PROJECT,PROJECTCODE:340072
4 425.00 W.T.P. In Progress
5 TATA PROJECTSLTD. HYDERABAD SBU-CS         (CONSTRUCTION                        SERVICES)SAGAR,MP-WATER                                 SUPPLYPROJECT/340072/58137
326.20 W.T.P.
In Progress
6 TATA PROJECTSLTD. HYDERABAD SUPPLY AND CONSTRUCTION OF PUMPHOUSES AND CHLORINATION BUILDINGSAS PER   PROJECT   SPECIFICATION   ANDDRAWINGS FOR PROJECT CODE : 340074DIST: BHIND
198.78 W.T.P. In Progress
TATA PROJECTSLTD. HYDERABAD WORK ORDER FOR CONSTRUCTION OFBOUNDARY WALL AT OUR BHIND WATERSUPPLY PROJECT/340074/66337 15.68 BOUNDARY WALL In Progress
7
8 TATA PROJECTSLTD. HYDERABAD SBU-CS)CONSTRUCTION                                                                   SERVICES)BHIND,MP-WATER                                  SUPPLYPROJECTS/340074/66991 200.38 W.T.P. In Progress
9 M/SGARUDAPALLYINFRASTRUCTURESPRIVATE LIMITED EARTH WORK, CONSTRUCTION, TESTING,TRAIL RUNNING,   COMMISSIONING   ANDMAINTAINING OF   WATER   TREATMENTPLANT OF 29 MLD CAPACITY HEAD WORKSAT “LEDUKI   WATER   SUPPLY   PROIECT”LEDUKI      WATER      AGREEMENT     NO:                    -16TEDT2020-21 DATED 23 RD SEPT-2020 551.00 W.T.P. In Progress
10 PMAY MORENA CONSTRUCTION       OF        HOUSES                                        ANDDEVELOPMENT OF INFRASTRUCTURE ATATARSUWA UNDER   PMAY   ,   MORENA(MUNSIPAL CORPORATION) 5000.00 BUILDING WORK In Progress
11 MPIDC BHOPAL UPGRADATION OF RCC DRAIN AT I/ABANMORE DISTRICT MORENA 439.00 RCC DRAIN  WORK In Progress
12 MPIDC BHOPAL NEW      INDUSTRIAL     AREA                PIPARSEWA,MORENA, MP   (I/C   RIGID   PAVEMENT   ,WATER SUPPLY , OVERHEAD WATER TANK ,WATER     TREATMENT    PLANT    ,                   INTAKEARRANGMENT     ,      ELECTRIC      WORK                                   ,PLANTATION ) 6973.36 COMPLETE INFRASTUCTURE WORK Completed
13

MPPWD

GWALIOR

CONSTRUCTION    OF    LUKWASA                               TOCHANDANPUR ROAD (ONGED) UPTORAJASTHAN BORDER. LENGTH 31.62 KM (UNDER CRIF SCHEME) 2761.47 ROAD & BRIDGE WORKS Completed

 

14

 

MPPWD GWALIOR

CONSTRUCTION         OF                                    NAISARAIASHOKNAGAR     TO    MAHANA                            ROAD LENGTH 29.00 KM

(UNDER CRIF SCHEME)

2500.47

ROAD & BRIDGE

WORKS

Completed
15 MPIDC BHOPAL INFRASTRUCTURE DEVELOPMENT ANDUPGRADATION WORK IN INDUSTRIALAREA GHIRONGI, MALANPUR , DIST. -BHIND 3884.76 ROADWORKS Completed
16 NAGAR NIGAMGWALIOR PROVIDING AND LAYING SEWER LINEIN GWALIOR CITY . 1504.12 SEWER LINE Completed

 

· Currently We had Approx. 381.58 crore in hand and about 294.92 crore works completed

RESOURCES AVAILABLE

Departments

  1. Administrative
  2. Site Execution Department .
  3. Billing
  4. Liasoning
  5. Accounts
  6. Maintenance
  7. Operation

 

Main power

Firm believes in the perfection and all employees’ work for the same spirit. Firm have highly qualified and experienced persons supported by young Civil and Mechanical Engineers having 15-20 years experience and Retired Govt. Nagar Nigam Commissioner abovehaving experience of 35-40 years.

There is support staff for CAD drafting and other report preparation. Accounts etc.are headed by other unit of firm. Manpower is trained properly so that they are acquainted with the latest techniques for arriving at the optimal solution of the problem through the use of computers etc. Company also enjoys services of visiting consultants.

Arrangements with other Agencies

Firm has arrangements with Madhav Institute of Technology, Gwalior and other engineering institutes at different places for material testing & other requirements that are not available with the firm.

Approach to the work

Working methodology of firm is based on the premise of satisfaction to the client. In all the assignments management gives enough thought to the concerned thoughts and work allocation is made inside the firm. Line of action to be followed to the work is decided by experts. Requisite data is collected and analyzed. After completely defining the problem engineering solution is obtained. While doing any project, submitting the detailed engineering report and Tender documents client’s requirements are taken into consideration. Client is kept abreast of the developments so the time completion of the work is achieved.

In construction work exact specifications are followed and almost all the principles of construction management are adhered to all the works executed in the past are of high quality and were completed as per the agreed schedule with the client.

Turnover of Civil Works In Last Five Years Financial Years

 

S.No FINANCIAL YEAR TURN-OVER(Rs. In LACS)
1. 2014-15 137.43
2. 2015-16 397.47
3. 2016-17 666.29
4. 2017-18 1821.96
5. 2018-19 3194.64
6. 2019-20 3136.75
7. 2020-21 3364.94
8. 2021-22 5419.80

Projected Turnover of Civil Works For Next Two Financial Years

 

S.No. FINANCIAL YEAR

TURN-OVER

(Rs. In LACS)

1. 2022-23 7500.00

Last Eight Year Financial Report Turn over (in lacs)

 

List of Plant & Machinery

Name of Equipment

Nos.
Availability

Batch mix Bituminous Plant (120 TPH) 1
Tar Boiler 4
Hot Mix Plant (Drum Type) (60 TPH) 1
Sensor Paver Finisher 1
Paver Finisher(Mechanical) 1
Air Compressor 2
Concrete MixerWith Hopper (6cum Capacity) 10
Water Tanker With Sprinkler 5
Grader 6
Road Roller (8-10 Tones) 2
Vibratory Roller

2

Soil Compactor Roller

3

Backhoe Loader (JCB and Bull Company)

4

Self-Loading Concrete Mixture (Drum O/P -4.3cum/batch)

3

Weigh Batch Mixer

1

Truck/ Tipper/Tractor

25

Vibratory Soil Compactor

3

Tandem Roller

1

Tata Back Loader

1

Hindustan Loader

1

Excavator Model Pc 130-7

1

Tata Hitachi-200

2

L& T (Excavator)

1

D.G. Set

6

Cube Mold

50

Dumpy Levels/Auto Levels

6

Hoist

2

Theodolite

4

Scaffolding & Steel Shuttering

80000 (sqm)

GI/Steel Plates

300

Water Pumps

4

Stone Cutter with Polishing Equipment Plant

2

Welding Set

5

Camber Boards

30

For field testing Laboratory for Construction of Works  
Sieve Set
(As per IRC SP – 20-2002)

4

Atterberg Limit Apparatus

4

Auto Compaction Test

4

Speedy Moisture Meter

4

Moisture Container

20

Spatula

8

Aggregate Impact Value Machine With Accessories

4

Flakiness Gauge as per IS 2386-I

4

3 M Straight Edge with Wedge

4

Water bath (Thermostatically Controlled up to 60 Degree C)

2

Softening test apparatus complete Accessories

2

Bitumen Extraction Machinery etc. complete

2

Bitumen Penetration Machinery with Accessories

2

Sand Replacement Cylinder with accessories

4

Core cutter with collar and hand rammer

4

Electronic Balance 200 g

4

Electronic Balance 2kg

4

Electronic Balance 5kg

4

Electronic balance 15 Kg

4

Thermometer

20

Enameled Tray (Small, Medium & Big)

12 each

Hot Plate

2

Concrete Mould 150×150 mm

24

Mortar Mould 50×50 mm

24

Camber Board (3.75M)

12

Electric Oven

2

Safety Helmets

100

Safety Jackets

150