Projects
With our highly efficient and unmatched quality products, we have achieved an enviable position in domestic as well as international market. We use finest quality raw material, procured from reliable sources to produce best quality range. Additionally, we have a team of well qualified professionals, who work closely with the clients to understand their requirements and offer best options for their specific needs. Some of the products offered by us are:
Projects Completed /In progress:- | |||||||||||||||||||||||||||||||||||||||
S.NO |
CLIENT |
PROJECT DETAILS |
Amountof Workin lacs |
Type of Work |
Status of Work |
|
|||||||||||||||||||||||||||||||||
1 | MPPWD,MORENA | WORK FROM OF MPPWD CONSTRUCTIONOF NOORABADH TEKRI TO BOCHOLARITORA ROAD LENGTH 27.00 KM. TEKRI-SUMWALI TO IMILIYA ROAD LENGTH 22.80KM DISTT MORENA | 6170.14 | ROAD | |||||||||||||||||||||||||||||||||||
In Progress | |||||||||||||||||||||||||||||||||||||||
MPPWDGWALIOR | WORK FROM OF MPPWD CONSTRUCTIONFROM GOL PAHARIYA TO GUPTESHWARMANSIR LENGTH 09.20 KM ROAD DISTTGWALIORROAD CONSTRUCTION OF SHANICHARA | ||||||||||||||||||||||||||||||||||||||
2 | 2342.87 | ROAD | In Progress | ||||||||||||||||||||||||||||||||||||
3 | MPPWDGWALIOR | MANDIR TO BATESHWAR PADAVALIRITHORA ROAD. LENGTH – 9.8 KM. KHEDAAJNODA KUTWAR TO BICHOLA RITHORAROAD. LENGTH – 13.76 KM/ BANMOR TOSANICHARA MANDIR ROAD. LENGTH -12.66 KM. TOTAL LENGTH 36.22 KM. INTHE STATE OF MADHYA PRADESH ON EPCMODE” | 4865.00 | ROAD | In Progress | ||||||||||||||||||||||||||||||||||
TATA PROJECTSLTD. HYDERABAD | SUPPLY AND INSTALLATION OF 5.7MLD WATER TREATMENT PLANT,FORSAGARWATER PROJECT,PROJECTCODE:340072 | ||||||||||||||||||||||||||||||||||||||
4 | 425.00 | W.T.P. | In Progress | ||||||||||||||||||||||||||||||||||||
5 | TATA PROJECTSLTD. HYDERABAD | SBU-CS (CONSTRUCTION SERVICES)SAGAR,MP-WATER SUPPLYPROJECT/340072/58137 | |||||||||||||||||||||||||||||||||||||
326.20 | W.T.P. | ||||||||||||||||||||||||||||||||||||||
In Progress | |||||||||||||||||||||||||||||||||||||||
6 | TATA PROJECTSLTD. HYDERABAD | SUPPLY AND CONSTRUCTION OF PUMPHOUSES AND CHLORINATION BUILDINGSAS PER PROJECT SPECIFICATION ANDDRAWINGS FOR PROJECT CODE : 340074DIST: BHIND | |||||||||||||||||||||||||||||||||||||
198.78 | W.T.P. | In Progress | |||||||||||||||||||||||||||||||||||||
TATA PROJECTSLTD. HYDERABAD | WORK ORDER FOR CONSTRUCTION OFBOUNDARY WALL AT OUR BHIND WATERSUPPLY PROJECT/340074/66337 | 15.68 | BOUNDARY WALL | In Progress | |||||||||||||||||||||||||||||||||||
7 | |||||||||||||||||||||||||||||||||||||||
8 | TATA PROJECTSLTD. HYDERABAD | SBU-CS)CONSTRUCTION SERVICES)BHIND,MP-WATER SUPPLYPROJECTS/340074/66991 | 200.38 | W.T.P. | In Progress | ||||||||||||||||||||||||||||||||||
9 | M/SGARUDAPALLYINFRASTRUCTURESPRIVATE LIMITED | EARTH WORK, CONSTRUCTION, TESTING,TRAIL RUNNING, COMMISSIONING ANDMAINTAINING OF WATER TREATMENTPLANT OF 29 MLD CAPACITY HEAD WORKSAT “LEDUKI WATER SUPPLY PROIECT”LEDUKI WATER AGREEMENT NO: -16TEDT2020-21 DATED 23 RD SEPT-2020 | 551.00 | W.T.P. | In Progress | ||||||||||||||||||||||||||||||||||
10 | PMAY MORENA | CONSTRUCTION OF HOUSES ANDDEVELOPMENT OF INFRASTRUCTURE ATATARSUWA UNDER PMAY , MORENA(MUNSIPAL CORPORATION) | 5000.00 | BUILDING WORK | In Progress | ||||||||||||||||||||||||||||||||||
11 | MPIDC BHOPAL | UPGRADATION OF RCC DRAIN AT I/ABANMORE DISTRICT MORENA | 439.00 | RCC DRAIN WORK | In Progress | ||||||||||||||||||||||||||||||||||
12 | MPIDC BHOPAL | NEW INDUSTRIAL AREA PIPARSEWA,MORENA, MP (I/C RIGID PAVEMENT ,WATER SUPPLY , OVERHEAD WATER TANK ,WATER TREATMENT PLANT , INTAKEARRANGMENT , ELECTRIC WORK ,PLANTATION ) | 6973.36 | COMPLETE INFRASTUCTURE WORK | Completed | ||||||||||||||||||||||||||||||||||
13 |
MPPWD GWALIOR |
CONSTRUCTION OF LUKWASA TOCHANDANPUR ROAD (ONGED) UPTORAJASTHAN BORDER. LENGTH 31.62 KM (UNDER CRIF SCHEME) | 2761.47 | ROAD & BRIDGE WORKS | Completed | ||||||||||||||||||||||||||||||||||
14 |
MPPWD GWALIOR |
CONSTRUCTION OF NAISARAIASHOKNAGAR TO MAHANA ROAD LENGTH 29.00 KM (UNDER CRIF SCHEME) |
2500.47 |
ROAD & BRIDGE WORKS |
Completed | ||||||||||||||||||||||||||||||||||
15 | MPIDC BHOPAL | INFRASTRUCTURE DEVELOPMENT ANDUPGRADATION WORK IN INDUSTRIALAREA GHIRONGI, MALANPUR , DIST. -BHIND | 3884.76 | ROADWORKS | Completed | ||||||||||||||||||||||||||||||||||
16 | NAGAR NIGAMGWALIOR | PROVIDING AND LAYING SEWER LINEIN GWALIOR CITY . | 1504.12 | SEWER LINE | Completed | ||||||||||||||||||||||||||||||||||
· Currently We had Approx. 381.58 crore in hand and about 294.92 crore works completed RESOURCES AVAILABLE Departments
Main powerFirm believes in the perfection and all employees’ work for the same spirit. Firm have highly qualified and experienced persons supported by young Civil and Mechanical Engineers having 15-20 years experience and Retired Govt. Nagar Nigam Commissioner abovehaving experience of 35-40 years. There is support staff for CAD drafting and other report preparation. Accounts etc.are headed by other unit of firm. Manpower is trained properly so that they are acquainted with the latest techniques for arriving at the optimal solution of the problem through the use of computers etc. Company also enjoys services of visiting consultants. Arrangements with other AgenciesFirm has arrangements with Madhav Institute of Technology, Gwalior and other engineering institutes at different places for material testing & other requirements that are not available with the firm. Approach to the workWorking methodology of firm is based on the premise of satisfaction to the client. In all the assignments management gives enough thought to the concerned thoughts and work allocation is made inside the firm. Line of action to be followed to the work is decided by experts. Requisite data is collected and analyzed. After completely defining the problem engineering solution is obtained. While doing any project, submitting the detailed engineering report and Tender documents client’s requirements are taken into consideration. Client is kept abreast of the developments so the time completion of the work is achieved. In construction work exact specifications are followed and almost all the principles of construction management are adhered to all the works executed in the past are of high quality and were completed as per the agreed schedule with the client. Turnover of Civil Works In Last Five Years Financial Years
Projected Turnover of Civil Works For Next Two Financial Years
Last Eight Year Financial Report Turn over (in lacs)
List of Plant & Machinery |
Name of Equipment |
Nos. |
Batch mix Bituminous Plant (120 TPH) | 1 |
Tar Boiler | 4 |
Hot Mix Plant (Drum Type) (60 TPH) | 1 |
Sensor Paver Finisher | 1 |
Paver Finisher(Mechanical) | 1 |
Air Compressor | 2 |
Concrete MixerWith Hopper (6cum Capacity) | 10 |
Water Tanker With Sprinkler | 5 |
Grader | 6 |
Road Roller (8-10 Tones) | 2 |
Vibratory Roller |
2 |
Soil Compactor Roller |
3 |
Backhoe Loader (JCB and Bull Company) |
4 |
Self-Loading Concrete Mixture (Drum O/P -4.3cum/batch) |
3 |
Weigh Batch Mixer |
1 |
Truck/ Tipper/Tractor |
25 |
Vibratory Soil Compactor |
3 |
Tandem Roller |
1 |
Tata Back Loader |
1 |
Hindustan Loader |
1 |
Excavator Model Pc 130-7 |
1 |
Tata Hitachi-200 |
2 |
L& T (Excavator) |
1 |
D.G. Set |
6 |
Cube Mold |
50 |
Dumpy Levels/Auto Levels |
6 |
Hoist |
2 |
Theodolite |
4 |
Scaffolding & Steel Shuttering |
80000 (sqm) |
GI/Steel Plates |
300 |
Water Pumps |
4 |
Stone Cutter with Polishing Equipment Plant |
2 |
Welding Set |
5 |
Camber Boards |
30 |
For field testing Laboratory for Construction of Works | |
Sieve Set (As per IRC SP – 20-2002) |
4 |
Atterberg Limit Apparatus |
4 |
Auto Compaction Test |
4 |
Speedy Moisture Meter |
4 |
Moisture Container |
20 |
Spatula |
8 |
Aggregate Impact Value Machine With Accessories |
4 |
Flakiness Gauge as per IS 2386-I |
4 |
3 M Straight Edge with Wedge |
4 |
Water bath (Thermostatically Controlled up to 60 Degree C) |
2 |
Softening test apparatus complete Accessories |
2 |
Bitumen Extraction Machinery etc. complete |
2 |
Bitumen Penetration Machinery with Accessories |
2 |
Sand Replacement Cylinder with accessories |
4 |
Core cutter with collar and hand rammer |
4 |
Electronic Balance 200 g |
4 |
Electronic Balance 2kg |
4 |
Electronic Balance 5kg |
4 |
Electronic balance 15 Kg |
4 |
Thermometer |
20 |
Enameled Tray (Small, Medium & Big) |
12 each |
Hot Plate |
2 |
Concrete Mould 150×150 mm |
24 |
Mortar Mould 50×50 mm |
24 |
Camber Board (3.75M) |
12 |
Electric Oven |
2 |
Safety Helmets |
100 |
Safety Jackets |
150 |